Wednesday, January 03, 2007
















VIPER PACKING CHECKLIST

BOX
WOOD BASE
LOGO
UPPER FUSELAGE
LOWER FUSELAGE
BRASS TUBE
WINGS
TOP ENGINE (MAIN)


BAG 1
ENGINES ( R & L, MAIN)
ENGINES (R & L BASES)
ENGINE NOZZLES ( TOP, L & R)
ENGINE NOZZLES ( TOP, L & R) clear
ENGINE COWLINGS (L,R,T)
REAR BUTT PLATE

BAG 2
TOP FIN / RUDDER
FUSELAGE DETAIL STRIPS (L,R)
INTAKE DETAIL (L,R)
LOWER ENGINE DETAIL (L,R)
UPPER ENGINE SIDE DETAIL (L,R)
LANDING GEAR STRUTS (3)
LANDING GEAR DOORS FRONT (2)
LANDING GEAR DOORS REAR (4)

BAG 3
COCKPIT SHROUD (UPPER)
COCKPIT SHROUD (LOWER)
SEAT ( FRAME)
SEAT ( SVPACK)
SEAT ( HOSE)
NOSE
GUN MOUNTS (L,R)
GUNS (NOZZELS)
GUNS (BARRELS)
WINGLIGHTS (FOUR)
INSTRUMENTS ( 2 FRONT PANELS)
INSTRUMENTS ( 4 SIDE PANELS)
FLOOR

BAG 4
COCKPIT FRAME
PIPES FOR ENGINE DETAIL
PILOT BODY
PILOT HEADS (NAKED, HELMETED)
PILOT ARMS (L & R POSE 1)
PILOT ARMS (L & R POSE 2)
ENVELOPE
GLASS
DECAL SHEET
DECAL SHEET Instructions
INSTRUCTIONS Kit
COA/Thank you letter

Yeah...I have to go through that check list for each kit. When you get yours, please inventory and make sure nothing was left off. Your cockpit frame and the hydrualics are IN the fuselage.
The Hydraulic line casting by the way should be used as a GUIDE to Build something from wire.
Resin wires ...look like....resin wires. Just a suggestion.

1 Comments:

Blogger spinkick said...

please advise of a ship date (request is in your email). Yep..was preorder. Thank you

1:04 PM  

Post a Comment

<< Home